Search

Enhancements at The Lodge

The Lodge Will Soon Be Even Better Than Best


Accolades such as twice being named the #1 Hotel in the country by U.S. News & World Report and receiving the Forbes Five-Star and AAA Five-Diamond awards year after year say a lot about what you can expect when you stay with us. Rather than resting on those laurels, we have some great plans to enhance The Lodge experience and want to share them with you.

Enhancement Highlights


What is being done and where?

We are adding:

  • Six new cottages, located on the western side of The Lodge
  • An oceanfront pool, between The Lodge and St. Simons Sound, and a pool amenity building adjacent to the pool
  • A putting course, set between The Lodge Terrace and Plantation #10, adding a new dimension to the golf experience during the day and evening
  • A new, 17,000-square-foot Golf Performance Center, taking the place of the existing Center. The new facility will feature six instruction and club fitting bays and a putting studio – both with industry-leading technology for teach and club fitting – a full-service golf club workshop, a gym with locker rooms, spacious retail area, and indoor and outdoor meeting and event spaces.
  • The current GPC will be open and fully functional while the new facility is underway.

How will the cottages be configured?

Five of the cottages will each have two bedrooms and a parlor, and one will have four bedrooms and a parlor, for a total of 14 new sleeping rooms.

What’s included in The Lodge Pool House?

It will offer food and beverage service, double fireplaces, a wrap-around porch, indoor and outdoor event space, and will serve as the halfway house for Plantation once the project is complete.

When is this happening?

Pending approval, we will begin in December. The project will be complete in time for the 2018 RSM Classic in November.

As a guest, what will I see and how could this affect my visit?

The pool and cottage projects will be screened. All Lodge and golf facilities will remain open as usual while work is underway, so staying overnight, playing golf, and dining will not be affected. The tee box for Plantation #10 has been relocated and redesigned as a short Par 4. For putting practice, you will use the putting greens at either the Golf Performance Center or Seaside #1.

There will be times when some sounds will be heard during the day. Work will not be done at night, so no one’s rest will be disturbed. Some aspects of the new cottages are being assembled off site, to minimize disruption.

Will the bagpiper continue to play during the enhancements?

The bagpiper will play each evening as usual.

 

If you are using a screen reader and are having problems using this website, please call 855-572-4975 for assistance. [ Dismiss ]